Define the work
Capture the circuit or equipment, location, scope, drawings and responsible people.
Electrical contractors
Keep scope, drawings, RAMS and evidence together. Use the live safe-isolation workflow while EIC, MEIWC and EICR stay blocked from public issue pending specialist approval.
SiteHQ in practiceThe practical problem
An internal site isolation record is not an Electrical Installation Certificate or an EICR. SiteHQ keeps those purposes separate so a useful workflow does not become an unsupported claim of inspection, testing or certification.
An isolation record is kept distinct from installation certificates and condition reports.
A practical example
Keep the project scope, drawings, RAMS and evidence together, with a dedicated safe-isolation record and specialist certificate workflows kept firmly gated.
Capture the circuit or equipment, location, scope, drawings and responsible people.
Record every energy source and intended isolation point without claiming it has been proved.
The authorised person records lock/tag ownership, test instrument, actual verification and handover.
Record work completion, checks, authorisation and reinstatement as separate events.
Relevant SiteHQ records
Status wording is deliberately explicit. A workflow being present in software does not by itself approve a specialist certificate or replace the person responsible for the real work.
Available in the current SiteHQ product with competent review required.
Dedicated verification, handover and reinstatement workflow in SiteHQ.
Distinct typed Preview workflows exist, but electrician review, rights review and public-issue authority remain outstanding.
Enter once, carry forward carefully
SiteHQ can reuse confirmed information and keep its source visible. It must not turn a document reference into a physical observation.
Energy sourcesMain supply and control circuit listed
Physical verificationNot inferred — must be recorded on site
HandoverNamed issuer and receiver required
Certificate boundaryNot an EIC, MEIWC or EICR
Human approval stays visible
SiteHQ does not test electrical installations, verify safe isolation or certify work. EIC, MEIWC and EICR public issue remains blocked until an experienced electrician reviews each workflow and the applicable form-rights position is resolved.
Questions contractors ask
No. The distinct workflow is Preview validated, but practitioner approval and public-issue authority are still outstanding.
No. AI must not invent readings, inspection findings, verification, competence or signatures.
No. The isolation record controls a site activity; an EIC is a specialist certificate with different inspection, testing and signatory requirements.
Start with SiteHQ Free
Free £0 · Business £195 + VAT/month · Enterprise £495 + VAT/month.
Start free