Learning centre
Practical answers for contractors building a clearer project record.
Each guide answers one real question, shows a construction example, explains the matching SiteHQ workflow and keeps competent-person responsibility clear.
What is a construction phase plan?
A plain-English guide to the CPP, who prepares it and how it stays useful during the work.
Read the guide02CPP versus RAMS
How the project-wide construction phase plan differs from task-level risk assessment and method information.
Read the guide03How to organise construction site records
A practical structure for instructions, photographs, diaries, documents and decisions.
Read the guide04Permit to dig versus excavation inspection
Why authorising a dig and inspecting the excavation are two different records.
Read the guide05Electrical isolation record versus EIC
The difference between controlling an isolation and certifying electrical installation work.
Read the guide06Lift plan versus LOLER examination report
Why planning a lifting operation is different from examining the lifting equipment.
Read the guide07Waste transfer note versus hazardous-waste consignment note
Which record follows non-hazardous waste and which follows hazardous waste.
Read the guide08What to record in a construction site diary
A useful daily record of people, work, conditions, instructions, progress and problems.
Read the guide09How QR induction and attendance work
What a worker does on their phone and what the project team can see afterward.
Read the guideStart with SiteHQ Free
Create your workspace with Google sign-in. No card required.
Free £0 · Business £195 + VAT/month · Enterprise £495 + VAT/month.
Start free