Define the boundary
Record the exact dig area, depth, purpose, drawings and responsible people.
Groundworks contractors
Connect drawings, service information and RAMS while keeping the permit to dig separate from the competent inspection of the excavation.
SiteHQ in practiceThe practical problem
Permission to start digging is not the same as a later competent inspection of an excavation. SiteHQ keeps the two records separate so plans, detection, physical findings and ongoing actions are not collapsed into one checkbox.
The permit authorises a defined dig; the inspection records competent findings later.
A practical example
SiteHQ connects project drawings, RAMS and evidence with distinct workflows for permits to dig and excavation inspections.
Record the exact dig area, depth, purpose, drawings and responsible people.
Capture plan review, survey/detection, markings, trial holes and plant limits.
Set a validity window and record issuer, receiver and handback.
A competent inspector records support, access, defects, actions and whether the excavation is available.
Relevant SiteHQ records
Status wording is deliberately explicit. A workflow being present in software does not by itself approve a specialist certificate or replace the person responsible for the real work.
Keep source information and reviewed controls with the project.
Dedicated time-bound workflow; physical clearance is never inferred.
Separate competent-inspector workflow with findings, defects and actions.
Enter once, carry forward carefully
SiteHQ can reuse confirmed information and keep its source visible. It must not turn a document reference into a physical observation.
BoundaryMarked 12 m trench, 1.2 m target depth
ServicesPlans supplied; detection result requires site entry
PermitIssuer, receiver and expiry required
InspectionSeparate competent-person findings record
Human approval stays visible
SiteHQ does not locate buried services, verify markings, inspect ground conditions or decide an excavation is safe. Those checks must be completed and recorded by authorised competent people.
Questions contractors ask
No. Drawings are one evidence source; physical detection and other required site checks must be completed by competent people.
No. They are distinct records with different triggers, findings and responsible people.
No. A time-bound permit must be reviewed and reissued rather than silently extended.
Start with SiteHQ Free
Free £0 · Business £195 + VAT/month · Enterprise £495 + VAT/month.
Start free