Groundworks contractors

Keep service clearance, dig authority and excavation inspection as separate decisions

Connect drawings, service information and RAMS while keeping the permit to dig separate from the competent inspection of the excavation.

SiteHQ fictional document workspace used for groundworks records.SiteHQ in practice

The practical problem

Keep service clearance, dig authority and excavation inspection as separate decisions

Permission to start digging is not the same as a later competent inspection of an excavation. SiteHQ keeps the two records separate so plans, detection, physical findings and ongoing actions are not collapsed into one checkbox.

SiteHQ · Groundworks records

FICTIONAL DEMONSTRATION

South yard drainage excavation

The permit authorises a defined dig; the inspection records competent findings later.

Inspection due 07:00
Permit to digPTD-005 - authorised area B3-B5
ServicesPlans reviewed; physical locating required
Excavation inspectionSeparate start-of-shift record
Open actionConfirm edge-protection change

A practical example

From service information to an inspected excavation

SiteHQ connects project drawings, RAMS and evidence with distinct workflows for permits to dig and excavation inspections.

01

Define the boundary

Record the exact dig area, depth, purpose, drawings and responsible people.

02

Clear the services

Capture plan review, survey/detection, markings, trial holes and plant limits.

03

Issue the permit

Set a validity window and record issuer, receiver and handback.

04

Inspect separately

A competent inspector records support, access, defects, actions and whether the excavation is available.

Relevant SiteHQ records

What is available—and what remains gated.

Status wording is deliberately explicit. A workflow being present in software does not by itself approve a specialist certificate or replace the person responsible for the real work.

RAMS, drawings and project evidence

Available now

Keep source information and reviewed controls with the project.

Permit to dig and services-clearance record

Available now

Dedicated time-bound workflow; physical clearance is never inferred.

Excavation inspection report

Available now

Separate competent-inspector workflow with findings, defects and actions.

Enter once, carry forward carefully

Useful project information moves with the job.

SiteHQ can reuse confirmed information and keep its source visible. It must not turn a document reference into a physical observation.

  • Project, location and dig boundary
  • Drawings, surveys and service information
  • RAMS, people, plant and dates
  • Attachments, permit version and later inspection link
Fictional Preview exampleDrainage trench beside loading bay

BoundaryMarked 12 m trench, 1.2 m target depth

ServicesPlans supplied; detection result requires site entry

PermitIssuer, receiver and expiry required

InspectionSeparate competent-person findings record

Human approval stays visible

SiteHQ prepares and controls the record. People make the decision.

SiteHQ does not locate buried services, verify markings, inspect ground conditions or decide an excavation is safe. Those checks must be completed and recorded by authorised competent people.

Questions contractors ask

Clear answers before you start.

Can SiteHQ clear the area from drawings alone?

No. Drawings are one evidence source; physical detection and other required site checks must be completed by competent people.

Is the excavation inspection part of the permit?

No. They are distinct records with different triggers, findings and responsible people.

Can an expired permit be reused?

No. A time-bound permit must be reviewed and reissued rather than silently extended.

Start with SiteHQ Free

Create your workspace with Google sign-in. No card required.

Free £0 · Business £195 + VAT/month · Enterprise £495 + VAT/month.

Start free