Plumbing and mechanical contractors

Keep plant, services, isolations and recommissioning in one controlled record

Connect plant identity, drawings, RAMS and responsible people, then keep the planned isolation, actual checks, handover and recommissioning as distinct steps.

SiteHQ fictional project workspace used to organise a mechanical work package.SiteHQ in practice

The practical problem

Keep plant, services, isolations and recommissioning in one controlled record

Mechanical work can involve pressure, temperature, stored energy and several isolation points. A useful record must separate the planned isolation from the physical checks, handover and recommissioning completed by authorised people.

SiteHQ · Mechanical isolation

FICTIONAL DEMONSTRATION

Level 4 chilled-water branch

Energy sources, stored pressure and return-to-service checks stay in one record.

Made safe
SystemEast office fan-coil branch
EnergyPressure / electrical / retained fluid
HandoverSafe-state confirmation recorded
ReinstatementResponsible-person approval pending

A practical example

From replacement enquiry to controlled recommissioning

Bring scope, drawings, RAMS and project evidence together, then use a dedicated mechanical-isolation workflow without turning SiteHQ into a regulated certificate issuer.

01

Identify the plant

Record the service, equipment, work area, medium, pressure and temperature.

02

Plan the controls

List valves, blinds, drains, vents, locks and the responsible people.

03

Record the handover

Capture actual verification and the work-party handover without AI inference.

04

Recommission

Keep completion, reinstatement checks and authority to return the service together.

Relevant SiteHQ records

What is available—and what remains gated.

Status wording is deliberately explicit. A workflow being present in software does not by itself approve a specialist certificate or replace the person responsible for the real work.

RAMS, diary and project files

Available now

Current project records remain available with human review.

Mechanical isolation, depressurisation and reinstatement

Available now

Dedicated plant/service workflow with handover and recommissioning controls.

Water fittings compliance workflow

Preview validated — not generally available

Dedicated Preview workflow exists; scheme eligibility and practitioner review are required before issue.

Existing gas safety certificate

Upload and track

Upload and track only. SiteHQ does not issue gas safety records.

Enter once, carry forward carefully

Useful project information moves with the job.

SiteHQ can reuse confirmed information and keep its source visible. It must not turn a document reference into a physical observation.

  • Plant/service identity and exact location
  • Scope, drawings and work-package dates
  • RAMS and responsible people
  • Attachments, approvals and revision history
Fictional Preview exampleLevel 2 heating branch isolation

MediumLow-temperature hot water

Drain/ventLocations listed for authorised confirmation

Actual checksRequired from the person on site

RecommissioningSeparate completion and authority fields

Human approval stays visible

SiteHQ prepares and controls the record. People make the decision.

SiteHQ does not verify pressure, prove isolation, commission plant or certify regulated work. Those decisions and observations belong to the authorised contractor and relevant specialist.

Questions contractors ask

Clear answers before you start.

Can AI confirm a valve is closed?

No. Physical status must be observed and recorded by the responsible person.

Does SiteHQ issue gas certificates?

No. Existing gas certificates can be uploaded and tracked; SiteHQ does not issue them.

Who can approve water-fittings compliance?

That depends on the applicable scheme, member eligibility and permitted scope. Public issue remains gated pending specialist review.

Start with SiteHQ Free

Create your workspace with Google sign-in. No card required.

Free £0 · Business £195 + VAT/month · Enterprise £495 + VAT/month.

Start free