Define the operation
Capture the load, location, equipment, route, programme and supporting drawings.
Scaffolding and lifting contractors
A scaffold tag is not the inspection report, a lift plan is not a LOLER thorough-examination report, and SiteHQ does not replace the competent people behind those records.
SiteHQ in practiceThe practical problem
A scaffold tag is not the inspection report, a lift plan is not a LOLER thorough-examination report, and software cannot replace the competent inspector, appointed person or examiner.
The lift plan, scaffold inspection and LOLER examination remain different records.
A practical example
Connect the project scope, equipment, people and evidence while preserving the different authority behind a scaffold inspection, a lift plan and a LOLER report.
Capture the load, location, equipment, route, programme and supporting drawings.
Structure capacity, radius, ground, roles, communications and rescue for appointed-person review.
Link external or gated equipment examination records without treating them as the lift plan.
Create a new controlled revision when the load, equipment, route or site condition changes.
Relevant SiteHQ records
Status wording is deliberately explicit. A workflow being present in software does not by itself approve a specialist certificate or replace the person responsible for the real work.
Dedicated Preview workflow; competent scaffold-inspector review required.
Dedicated appointed-person Preview workflow with load, equipment and operation fields.
Separate Preview workflow; independent competent-examiner review required.
Current records can hold the supporting project evidence.
Enter once, carry forward carefully
SiteHQ can reuse confirmed information and keep its source visible. It must not turn a document reference into a physical observation.
LoadAHU module identity and stated mass
OperationRadius, route and ground need appointed-person review
LOLERKept as separate examiner evidence
Change controlEquipment or route change requires revision
Human approval stays visible
SiteHQ does not inspect scaffolds, plan lifting operations, calculate capacity or conduct a thorough examination. Public issue remains blocked until the relevant specialists approve the fields and outputs.
Questions contractors ask
No. The lift plan and thorough-examination report serve different purposes and have different competent roles.
No. A competent inspector must record the findings and decision.
The plan should return for review and a new controlled revision; the issued history should not be silently overwritten.
Start with SiteHQ Free
Free £0 · Business £195 + VAT/month · Enterprise £495 + VAT/month.